Sl. No. | Title | Tender Number | Advertisement Date | File | Updated On |
---|---|---|---|---|---|
751 | Electrical items | INS/L-5402/2019-2020(Y) |
31-08-2019 to 16-09-2019 |
L5402 (19-20).pdf | 31-08-2019 |
752 | Electrical Items | INS/L-5398/2019-2020(Y) |
30-08-2019 to 13-09-2019 |
L-5398 (19-20).pdf | 30-08-2019 |
753 | Document Shredder | INS/L-5331/2019-2020(Y) |
27-08-2019 to 02-09-2019 |
L-5331 2019-2020.pdf | 27-08-2019 |
754 | Four Door Vertical Freezer | INS/L-5390/2019-2020(Y) |
23-08-2019 to 06-09-2019 |
L-5390 (19-20).pdf | 23-08-2019 |
755 | Dining Chairs | INS/L-5387/2019-2020(Y) |
23-08-2019 to 09-09-2019 |
L-5387 (19-20).pdf | 23-08-2019 |
756 | Personnel Lockers | INS/L-5388/2019-2020(Y) |
23-08-2019 to 09-09-2019 |
L-5388 (19-20).pdf | 23-08-2019 |
757 | Cafeteria Tables | INS/L-5389/2019-2020(Y) |
23-08-2019 to 09-09-2019 |
L-5389 (19-20).pdf | 23-08-2019 |
758 | inStem website redesign | INS/W-5035/2019/2020(Y) |
23-08-2019 to 02-09-2019 |
W-5035 (19-20).pdf, W-5035 (19-20)...pdf | 23-08-2019 |
759 | IP DOME Cameras | INS/L-5338/2019-2020(Y) |
23-08-2019 to 05-09-2019 |
L-5338 (19-20).pdf | 23-08-2019 |
760 | Supply installation testing commissioning of walk in cold room or chiller room complete system | INS/W-5036/2019-2020(Y) |
22-08-2019 to 06-09-2019 |
W-5036 NIT.pdf | 22-08-2019 |
761 | Cell Culture Centrifuge. | INS/L-5335/2019-2020(Y) |
14-08-2019 to 28-08-2019 |
RFQ 5335.pdf | 14-08-2019 |
762 | Bead Bath | INS/L-5337/2019-2020(Y) |
14-08-2019 to 28-08-2019 |
L-5337 (2019-2020).pdf | 14-08-2019 |
763 | Microfuge Centrifuge Refrigerated. | INS/L-5334/2019-2020(Y) |
14-08-2019 to 28-08-2019 |
RFQ 5334.pdf | 14-08-2019 |
764 | -20 to30 Degree Freezer | INS/L-5324/2019-2020(Y) |
14-08-2019 to 28-08-2019 |
RFQ 5324.pdf | 14-08-2019 |
765 | REFRIGERATOR | INS/L-5326/2019-2020(Y) |
10-08-2019 to 26-08-2019 |
RFQ 5326.pdf | 10-08-2019 |
766 | PRINTER | INS/L-5328/2019-2020(Y) |
10-08-2019 to 26-08-2019 |
RFQ 5328.pdf | 10-08-2019 |
767 | -80 DEGREE FREEZER | INS/L-5325/2019-2020(Y) |
10-08-2019 to 26-08-2019 |
RFQ 5325.pdf | 10-08-2019 |
768 | HORIZONTAL HOODS | INS/L-5332/2019-2020(Y) |
10-08-2019 to 26-08-2019 |
RFQ 5332.pdf | 10-08-2019 |
769 | POWER PACK | INS/L-5336/2019-2020(Y) |
10-08-2019 to 26-08-2019 |
RFQ 5336.pdf | 10-08-2019 |
770 | iMAC | INS/L-5327/2019-2020(Y) |
10-08-2019 to 26-08-2019 |
RFQ 5327.pdf | 10-08-2019 |
771 | DESKTOP and LAPTOP | INS/L-5329/2019-2020(Y) |
10-08-2019 to 26-08-2019 |
RFQ 5329.pdf | 10-08-2019 |
772 | Inline Cabinet Fan | INS/L-5318/2019-2020(Y) |
09-08-2019 to 14-08-2019 |
L-5318 (19-20).pdf | 09-08-2019 |
773 | Pipes and Fittings | INS/L-5319/2019-2020(Y) |
09-08-2019 to 14-08-2019 |
L-5319 (19-20).pdf | 09-08-2019 |
774 | MS Boxing Works | INS/W-5029/2019-2020(Y) |
09-08-2019 to 16-08-2019 |
W-5029 (2019-2020).pdf | 09-08-2019 |
775 | Solid Carbon Dioxide (Dry Ice) | INS/L-5254/2019-2020(Y) |
09-08-2019 to 16-08-2019 |
RFQ L-5254.pdf | 09-08-2019 |
776 | Design of Annual Report 2018-19 for inStem | INS/W-5027/2019-2020(Y) |
08-08-2019 to 13-08-2019 |
RFQ W-5027.pdf | 08-08-2019 |
777 | Electrical Modifications | INS/W-5033/2019-2020(Y) |
06-08-2019 to 20-08-2019 |
W-5033 (19-20).pdf | 07-08-2019 |
778 | FM 200 Extension Setup | INS/L-5297/2019-2020(Y) |
06-08-2019 to 13-08-2019 |
L-5297 .(19-20).pdf | 06-08-2019 |
779 | Electrical Works | INS/W-5031/2019-2020(Y) |
02-08-2019 to 09-08-2019 |
W-5031 (19-20).pdf | 02-08-2019 |
780 | Mac Book Air | INS/F-5188/2019-2020(Y) |
01-08-2019 to 05-08-2019 |
F-5188_(2019-2020).pdf | 01-08-2019 |